- 1. Each project is charged by designated engineer;
- 2.Rapid prototyping is available if required.
- 3.Moldflow is available if required;
- 4.General mould assembly (2D/3D) Drawing will be provided for customer to check and confirm;
- 5.Weekly mould progress/timeline will be provided in Excel file,meanwhile we will take some mould pictures or video to show the progress;
- 6.We will do special treatment for each customer,in order to meet different requirment;
- 7.If required,we can provide certification of steel chemical composition and hardness;
- 8.LKM,JUFAN,YUDO,DME,HASCO AND HANDLING are our long-time supplier;
- 9.Our pursuing spirit is:detail decides quality,innovation creats progress;
- 10.We do every thing as our promise,short lead-time,first-class quality,excellent service for before-sale,through manufacturing and after-sale.
ADVANTAGE
1.mould life: ≥5,000,0002.excellent cooling system
3.even wall thickness
4.no distortion
5.very short cycle time
6.perfect lock system,water proof
7.perfect parting line
8.good stacking
9.high surface quality
10.no air gaps/bubbles
11.no burn marks
![](/Upload/Image/why.jpg)